Run a claim yourself.

This is the real claim screen, the real verification engine and the real payment formula, on the Nova Heights sample project. Only the analysis estimate is simulated, and nothing you do here is saved.

Sandbox · sample data. A working copy of the claim screen. Nothing here is saved.

CLM-0042

ABC Construction Ltd: First Floor Masonry

Nova Heights · claim dated 9 Oct 2026

Needs reviewNeeds review
  1. Draft (complete)

  2. Inspection (complete)

  3. Analysis (complete)

  4. Review (current: Needs review)

  5. Decision

  6. Payment

A reviewer must decide how much of this claim is verified.

Amount claimed
₦18,500,000
Against First Floor Masonry
Progress claimed
90%
By the contractor
Analysis estimate
67%
Simulated analysis
Verified progress
Pending
Decided by a reviewer

Your decision

The analysis estimates 67% against a claim of 90%. You decide what is verified; the payment recommendation follows. Try 69%: the reviewer counted the north wing.

What do you decide?

Between 0 and the claimed 90%.

Verified progress
67.0%
Recommended payment
₦13,772,222
Withheld from claim
₦4,727,778

Verification

11 checks, run by rules 1.0.0. Reasons are generated from measured values, never by a model.

  • Required evidence

    Pass

    All 6 required evidence items were provided.

    Expected 6 · Observed 6

    100% sure · required

  • Location

    Pass

    All 6 geotagged photos were taken within 150 m of the site.

    Expected 150 · Observed 25

    100% sure · required

  • Timing

    Pass

    All 6 timestamped photos were taken within 72 hours of submission.

    Expected 72 · Observed 21.3

    100% sure · required

  • Duplicate images

    Pass

    No duplicate photos found among 6 fingerprinted files.

    Expected — · Observed 0

    100% sure · required

  • Photo quality

    Pass

    6 of 6 photos meet the quality bar.

    Expected — · Observed 0

    100% sure

  • Analysis confidence

    Pass

    The analysis is 89% confident.

    Expected 75% · Observed 89%

    89% sure · required

  • Progress claimed vs observed

    FailSeverity: Critical

    Contractor claims 90% completion while verified estimate is 67%.

    Expected 90% · Observed 67%

    89% sure · required

  • Quantities vs BOQ

    FailSeverity: High

    Contractor claims 1152 m2 of Sandcrete blockwork (MASONRY-01) while 860 m2 (75%) is evidenced.

    Expected 1152 · Observed 860

    89% sure

  • Document consistency

    Pass

    The measurement sheet and BOQ sheet agree with the claim and BOQ.

    Expected 1152 · Observed 1152

    89% sure

  • Visible defects

    Pass

    1 minor defect(s) noted.

    Expected 0 · Observed 1

    89% sure · required

  • Schedule alignment

    Pass

    Visible work is at the masonry stage, matching the milestone.

    Expected Masonry · Observed Masonry

    89% sure

Risk score

55 / 100

High risk

Financial exposure

₦4,727,778

The part of the claim the evidence does not support.

What contributed

  • PROGRESS_VARIANCE: critical failure+30
  • BOQ_QUANTITY_MATCH: high failure+20
  • Financial exposure: 26% of the claim unsupported+5
Automated analysisSimulated (mock AI)mock · siteproof-mock-vision
Estimated completion
67%
Confidence
89%
Visible stage
Masonry
Defects noted
1
  • Blockwork built MASONRY-01860 m2

The analysis reports what it sees. It never decides a verdict, a status or a payment: the rules and your reviewers do.

Evidence

Eight files, each fingerprinted and inspected by the server. Illustrative site scenes stand in for photographs.

Exterior front · required

  • Exterior front: exterior-front.jpg
    exterior-front.jpgFlagged
    Captured
    10 Oct 2026, 13:15
    Distance from site
    25 m
    sha256 f341a53fbe24…

    Flagged: Quantities vs BOQ

Exterior rear · required

  • Exterior rear: exterior-rear.jpg
    exterior-rear.jpgAccepted
    Captured
    10 Oct 2026, 14:15
    Distance from site
    11 m
    sha256 f241a3ace86f…

Interior · required

  • Interior: interior.jpg
    interior.jpgAccepted
    Captured
    10 Oct 2026, 15:15
    Distance from site
    25 m
    sha256 f541a8653059…

Structural columns · required

  • Structural columns: structural-columns.jpg
    structural-columns.jpgAccepted
    Captured
    10 Oct 2026, 16:15
    Distance from site
    25 m
    sha256 f441a6d23d58…

Material storage · optional

  • Material storage: material-storage.jpg
    material-storage.jpgAccepted
    Captured
    10 Oct 2026, 17:15
    Distance from site
    11 m
    sha256 ef419ef34e09…

Defect evidence · optional

  • Defect evidence: hairline-crack.jpg
    hairline-crack.jpgAccepted
    Captured
    10 Oct 2026, 18:15
    Distance from site
    25 m
    sha256 ee419d60d3ac…

BOQ sheet · required

  • boq-sheet.pdfAccepted
    No capture time in file
    sha256 f141a219b419…

Measurement sheet · required

  • measurement-sheet.pdfAccepted
    No capture time in file
    sha256 f041a086ce90…

Quantities claimed

Quantities claimed against the BOQ
ItemClaimedBOQ
MASONRY-01Sandcrete blockwork1,152 m21,280 m2

Evidence pack

Seal the claim, its evidence, checks, decision, payment and audit trail into one fingerprinted record you can print or share.

Make a decision first: a pack records it.

Audit trail

  1. Claim created

    Amara Eze (QS) ·

  2. Claim submitted

    Amara Eze (QS) ·

  3. Inspection scheduled

    Amara Eze (QS) ·

  4. Inspection assigned

    Kelechi Obi (Project manager) ·

  5. Inspection started

    Tunde Bello (Site engineer) ·

  6. Evidence processed

    SiteProof system ·

  7. Inspection submitted

    Tunde Bello (Site engineer) ·

  8. Ai analysis completed

    SiteProof system ·

  9. Verification completed · needs review, risk 55

    SiteProof system ·

  10. Claim status changed · → Needs review

    SiteProof system ·

Want it on your own projects?

Create a workspace and load this same scenario with one click, or talk to us about a pilot on one live project.