Sample report on sample data: fictional people, illustrative site scenes and a simulated analysis. A real pack is generated from your own claim and sealed with a SHA-256 fingerprint.
Evidence pack · EP-0001 · version 1
CLM-0042: First Floor Masonry
Nova Heights (NH-LAG-001), Admiralty Way, Lekki Phase 1, Lagos · ABC Construction Ltd · prepared for Nova Developments Ltd
This pack records the evidence, automated checks and human decisions behind a progress-claim verification. The automated analysis only observed; the rules verified; named professionals decided. It does not itself move money.
Decision and payment
- Amount claimed
- ₦18,500,000
- Progress claimed
- 90%
- Progress verified
- 69.0%
- Analysis estimate
- 67%
- Recommended payment
- ₦14,183,333
- Approved payment
- ₦14,183,333
- Withheld from claim
- ₦4,316,667
- Method
- proportional v1
Approved. Finance can process the payment outside SiteProof.
Ngozi Adeyemi (Reviewer) decided partially verified at 69.0% on 11 Oct 2026, 09:40. “Counted the north wing, which the photos did not show.”
Payment approved by Kelechi Obi (Project manager) on 11 Oct 2026, 11:05.
Verification
Proposed verdict needs review by rules 1.0.0 (engine 1.0.0) on 10 Oct 2026, 15:42.
- Contractor claims 90% completion while verified estimate is 67%.
- Contractor claims 1152 m2 of Sandcrete blockwork (MASONRY-01) while 860 m2 (75%) is evidenced.
Required evidence
PassAll 6 required evidence items were provided.
Expected 6 · Observed 6 · 100% sure · required
Location
PassAll 6 geotagged photos were taken within 150 m of the site.
Expected 150 · Observed 25 · 100% sure · required
Timing
PassAll 6 timestamped photos were taken within 72 hours of submission.
Expected 72 · Observed 21.3 · 100% sure · required
Duplicate images
PassNo duplicate photos found among 6 fingerprinted files.
Expected — · Observed 0 · 100% sure · required
Photo quality
Pass6 of 6 photos meet the quality bar.
Expected — · Observed 0 · 100% sure
Analysis confidence
PassThe analysis is 89% confident.
Expected 75% · Observed 89% · 89% sure · required
Progress claimed vs observed
FailSeverity: CriticalContractor claims 90% completion while verified estimate is 67%.
Expected 90% · Observed 67% · 89% sure · required
Quantities vs BOQ
FailSeverity: HighContractor claims 1152 m2 of Sandcrete blockwork (MASONRY-01) while 860 m2 (75%) is evidenced.
Expected 1152 · Observed 860 · 89% sure
Document consistency
PassThe measurement sheet and BOQ sheet agree with the claim and BOQ.
Expected 1152 · Observed 1152 · 89% sure
Visible defects
Pass1 minor defect(s) noted.
Expected 0 · Observed 1 · 89% sure · required
Schedule alignment
PassVisible work is at the masonry stage, matching the milestone.
Expected Masonry · Observed Masonry · 89% sure
Risk score 55/100 (high), financial exposure ₦4,727,778: PROGRESS_VARIANCE: critical failure (+30), BOQ_QUANTITY_MATCH: high failure (+20), Financial exposure: 26% of the claim unsupported (+5).
Automated analysis
Simulated analysis (mock AI). Provider mock, model siteproof-mock-vision. The analysis reports what it observed; it did not decide the verdict or the payment.
- Estimated completion
- 67%
- Confidence
- 89%
- Visible stage
- Masonry
- Observations
- 3
Claim details
- Claim date
- 9 Oct 2026
- Stage
- Masonry
- Inspector
- Tunde Bello (Site engineer)
- Inspection submitted
- 10 Oct 2026, 15:41
“Sample data: the canonical Nova Heights scenario.”
| Item | Claimed | BOQ |
|---|---|---|
| MASONRY-01Sandcrete blockwork | 1,152 m2 | 1,280 m2 |
Evidence (8)
Exterior frontFlagged exterior-front.jpgCaptured 10 Oct 2026, 13:1525 m from sitesha256 f341a53fbe24c1f5…Flagged: Quantities vs BOQExterior rearAccepted exterior-rear.jpgCaptured 10 Oct 2026, 14:1511 m from sitesha256 f241a3ace86f556f…InteriorAccepted interior.jpgCaptured 10 Oct 2026, 15:1525 m from sitesha256 f541a8653059abcd…Structural columnsAccepted structural-columns.jpgCaptured 10 Oct 2026, 16:1525 m from sitesha256 f441a6d23d588713…Material storageAccepted material-storage.jpgCaptured 10 Oct 2026, 17:1511 m from sitesha256 ef419ef34e094bed…Defect evidenceAccepted hairline-crack.jpgCaptured 10 Oct 2026, 18:1525 m from sitesha256 ee419d60d3ac5cd7…- PDF
BOQ sheetAccepted boq-sheet.pdfNo capture time in filesha256 f141a219b4196e05… - PDF
Measurement sheetAccepted measurement-sheet.pdfNo capture time in filesha256 f041a086ce909093…
Review history
- Ngozi Adeyemi (Reviewer) · Verified a different progress at 69% · 11 Oct 2026, 09:40
“Counted the north wing, which the photos did not show.”
Audit trail
- 9 Oct 2026, 10:02Claim created · Amara Eze (QS)
- 9 Oct 2026, 10:05Claim submitted · Amara Eze (QS)
- 9 Oct 2026, 10:05Inspection scheduled · Amara Eze (QS)
- 9 Oct 2026, 11:20Inspection assigned · Kelechi Obi (Project manager)
- 10 Oct 2026, 13:05Inspection started · Tunde Bello (Site engineer)
- 10 Oct 2026, 15:38Evidence processed · SiteProof system
- 10 Oct 2026, 15:41Inspection submitted · Tunde Bello (Site engineer)
- 10 Oct 2026, 15:42Ai analysis completed · SiteProof system
- 10 Oct 2026, 15:42Verification completed · SiteProof system
- 10 Oct 2026, 15:42Claim status changed · SiteProof system
- 11 Oct 2026, 09:40Review recorded · Ngozi Adeyemi (Reviewer) · “Counted the north wing, which the photos did not show.”
- 11 Oct 2026, 09:40Claim decided · Ngozi Adeyemi (Reviewer)
- 11 Oct 2026, 09:40Payment recommended · SiteProof system
- 11 Oct 2026, 11:05Payment approved · Kelechi Obi (Project manager)
- 11 Oct 2026, 11:30Evidence pack generated · Kelechi Obi (Project manager)